Shyam Metalics Recruitment 2025 – Apply Online for Stainless Steel Division | Sambalpur, Odisha
Shyam Metalics Recruitment 2025: Shyam Metalics Ltd Sambalpur Openings for Engineers, Shift In-Charge, Foreman, Fitter, QA/QC, Oxygen Plant, and more. Apply Online now at ssproject.recruitment@shyamgroup.com
Shyam Metalics Recruitment 2025: Shyam Metalics & Energy Ltd invites applications for multiple positions in its Stainless Steel Division, Sambalpur, Odisha.
Shyam Metalics Recruitment 2025 – Multiple Openings in Stainless Steel Division | Sambalpur, Odisha
Company:
Shyam Metalics Sambalpur.
Division:
Stainless Steel Division
You may also like– Aarti Steels Recruitment 2025 Desk Engineer / Shift Incharge (Boiler & Turbine) | Power Plant
Shyam Metalics Recruitment 2025 Open Positions: Eligibility, Experience, Education
Overall
- HOD (GM / Sr. GM)
- I/F AOD (AGM)
- MIS & Cost Executive
I/F Furnace Process
- Production Manager
- Shift In-Charge
- Melter
- Supervisor
Caster (Billet / Bloom / Slab)
- AGM, Manager, Shift In-Charge
- Foreman, Sr. Fitter, General Fitter (Maintenance)
- Gas Cutter, Welder, TEEMER MAN
Note: Candidates with experience in Open & Close Caster will be preferred.
Billet Yard / Slab Yard
- Supervisor
Mechanical Maintenance
- DGM/AGM, Manager, Engineer, Shift Engineer
General Mechanical Team
- Fitter, Turner, Welder, Gas Cutter
Electrical Maintenance
- Dy. Manager, Engineer, Shift Engineer, Electrician, Foreman, Engineer CCM
QA/QC
- QC Manager, Chief Chemist, Spectro Chemist, Chemical Lab Chemist
Store
- Dy. Manager, Sr. Officer, Supervisor
Oxygen Plant
- Foreman Mechanical, Fitter
Scrap Yard
- Scrap In-Charge, Charging Supervisor, Unloading Supervisor
How to Apply:
Send your CV to:
📧 ssproject.recruitment@shyamgroup.com

The Sambalpur manufacturing plant, located in the state of Odisha, is an integrated steel facility with a total installed metal capacity of 6.25 MTPA (including both intermediate and final products) as of March 31, 2024.
As of December 31, 2020, the plant included a wide range of production units such as:
- Two pellet plants,
- Seven Direct Reduced Iron (DRI) kilns for sponge iron production — consisting of two kilns of 350 TPD, two kilns of 100 TPD, and three kilns of 500 TPD,
- Twelve billet furnaces — including four furnaces of 18 TPH, four furnaces of 8 TPH, and four furnaces of 12 TPH,
- One each of rolling mill, structural mill, wire rod mill, and pipe mill,
- And seven ferro alloy furnaces — with two furnaces of 6.0 MVA, two furnaces of 9 MVA, and three furnaces of 11 MVA.
The following table presents the installed capacities as of December 31, 2020, along with the proposed capacity expansion plans for the Sambalpur manufacturing plant, showcasing its continuous growth and modernization.
The table below shows the installed capacities as of December 31, 2020, along with the proposed capacity expansions at the Sambalpur manufacturing plant:
| Particulars | Existing Installed Capacity (as of Dec 31, 2020) | Proposed Capacity Expansion | 
|---|---|---|
| Pellet | 3,000,000 TPA | 600,000 TPA | 
| Sponge Iron (1) | 1,155,000 TPA | 561,000 TPA | 
| Billet (2) | 862,480 TPA | 461,200 TPA | 
| Rolling Mill & Wire Rod Mill | 320,000 TPA | 510,000 TPA | 
| Structure Mill | 60,000 TPA | – | 
| Pipe Mill | 30,000 TPA | – | 
| Ferro Alloy (3) | 112,000 TPA | 14,000 TPA | 
Note:
- The information regarding the existing installed capacity as of December 31, 2020, and the proposed capacity expansion is based on various assumptions and estimates considered during the calculation of installed capacity. 
 These assumptions are in line with standard capacity calculation practices followed in the steel industry and are derived after reviewing the company’s explanations and the details of the equipment installed at the plant.
- The specific assumptions and estimates taken into account are as follows: - (1) Sponge Iron (Direct Reduced Iron): Capacity of each kiln (in TPD) × 330 days per year
- (2) Billet: Capacity of each furnace (in TPH) × (24 hours per day ÷ heat cycle) × 330 days per year; where 1 heat cycle = 3 hours
- (3) Ferro Alloy Products: A furnace with 1 MVA capacity is equivalent to 1,555.56 TPA. The installed capacity of ferro alloy products may vary depending on the specific type of ferro alloy produced.
 
This table highlights the steady progress and planned growth of the Sambalpur plant, reflecting its aim to enhance production capacity and operational efficiency in the coming years.
You may also like– Aarti Steels Recruitment 2025 Desk Engineer / Shift Incharge (Boiler & Turbine) | Power Plant
- Sree Metaliks Recruitment 2025 Walk-in Interview 2025 – Multiple Openings in Bhubaneswar | Apply Now
- HIL Recruitment 2025 – Apply for Electrician Post in Hirakud, Sambalpur
- Shyam Metallics Recruitment 2025 – Multiple Openings in Steel Melting Shop (SMS) at Sambalpur
- Aarti Steel Ltd Recruitment 2025 – Shift In-Charge (E&I Power Plant) | Apply Now
- Maithan Ispat Ltd Recruitment 2025 – Apply for SMS Head (Steel Melting Shop), Jajpur
- RRB NTPC Apply Online 2025 | RRB NTPC Vacancy 2025 | RRB NTPC Graduate Level Recruitment 2025- Apply Online
- ESL Steel Limited Recruitment 2025 – Shift In-Charge (Blast Furnace) | Apply Now
- IRCTC Apprentice Trainees Recruitment 2025 Apply Now – 45 Post Vacancies
- Lalbaba Group Recruitment 2025: Hot Mill Production Engineer (Piercer Mill) – Apply Now in Haldia
- Avdhoot Recruitment 2025 – Metallurgical Lab Assistant Job in Nashik
- TN MRB Dental Hygienist Recruitment 2025 Apply Now- For 39 Post Vacancies
- Shri Bajrang Power and Ispat Ltd Recruitment 2025 Online – Apply Now for Engineer, Chemist & Operator Jobs
- Shyam Ferro Alloys Ltd Recruitment 2025 – Apply Now for Ferro Alloys & Sinter Plant Jobs
- BSF Constable General Duty Recruitment 2025 Apply Online, Last Date – 391 Vacancies Notification
- Shyam Metalics Recruitment 2025 – Walk-In Interview at Durgapur
- HVF AVNL Junior Technician Recruitment 2025 Apply: Job Posts 98 Vacancies